Organic Deposit Removal for High Pour-Point Oil (HPPO) Well Stimulation. Solusi atasi hambatan produksi akibat endapan wax/parafin dan aspaltin di reservoir near-wellbore, perforasi & tubing.
Shear Dilation-Based Stimulation without Proppant Using Low-Rate Pumping designed to induce fracture widening (dilation) through a shear-failure mechanism.
Delayed Acid System for Carbonate Reservoir. An in-house formulation by the TII team designed to dissolve the rock matrix and enhance flow using a delayed-acid stimulation system.